Walnut Creek Athletic Complex was built in 1992 and renovated in 2019. The softball facility features nine fenced, halogen lit diamonds with skinned infields and hybrid grass outfields. Amenities include: all fields with underground irrigation, 18 bullpens, nine newly built scorekeeping areas at the backstop of each field, a public address system throughout the entire complex, wireless internet connection, and a food truck alley between wheels. Wheel 1 has five fields and wheel 2 has four fields. Additional amenities include enclosed and covered dugouts, and each wheel features a control tower with bathrooms and referee lounge.
Manager